Before the removal process begins, your solar system is visually inspected for any damaged panels, inverters, wiring, mounting hardware, and/or racking.

 

The system is tested for voltage and overall system efficiency. These readings are documented to ensure proper output after reinstallation.

 

Once the inspection process is complete, the system is shut down and de-energized. This involves disconnecting the solar panels from the inverter and the main electrical panel.

​​

Removal Process

​

1: Remove pipe runs, roof boxes & wiring

​

2: Remove mounting hardware

​​

3: Carefully remove panels

​

4: Store or transport panels

 

Once the panels, mounting hardware and racking are safely on the ground, we store them in a safe and dry place on site or transport them to a new location, depending on your project requirements.

​